This information is collected and maintained at project offices and is used as a basis for issuing . Minor Work, Structures, and Discharges of Dredged and Fill Material in Michigan (for docks, seawalls and riprap, dredging, boat hoists/wells/ramps, groins, submerged utilities and water intakes, temporary cofferdams, removal of structures, sand paths, grooming of sand, boardwalks etc.). Public Transportation Projects - Replacement of culverts with culverts or bridges. Authorizes the TxGLO to conduct work and temporarily excavate, and place dredged and/or fill material for the purpose of removing debris that presents a physical hazard, derelict vessels and derelict structures and abandoned pipelines. Are there any color restrictions for the roof or dock? subject to verification in writing by the Crisp County Power Commission (CCPC) in accordance with CCPC's Lake Blackshear Shoreline Management Plan for Lake Blackshear Project No. authorizes revetments and bulkheads constructed of the following materials or methods: 1) broken concrete; 2) rock; 3) formed or fabricated concrete; 4) sheet metal with metal or wood pilings; 5) untreated timber; 6) plastic or PVC; 7) fi,berglass; 8) weathered creosote treated timber (placed above ordinary high water marl< only); 9) vegetation, including, but not limited to, grasses or willows. For questions. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the US. Authorized for an area bounded on the south and west by the existing perimeter levee, on the north by a marsh adjacent to the perimeter levee, and on the east by State Highway 124 and the 5-foot elevation contour, at the base of High Island, Galveston County, Texas. PWC lifts may be attached to a dock but will be counted as part of the square footage of the dock. If the proposed dock would have at least 4ft. You must provide the permit number by which the subject dock was last authorized so that plans for the dock can be reviewed. Authorizes placement of dredged or fill materials impacting a cumulative maximum of 75.0 acres of wetlands identified for commercial/industrial development in accordance with the City of Superior Special Area Management Plan (SAMP) and City of Superior zoning code or ordinances. Public Transportation Projects -Replacement of bridges with bridges. Atlanta, Ga. - Beginning January 1, 2020, the U.S. Army Corps of Engineers, South Atlantic Division, will implement a revised administrative fee schedule resulting in a total cost of $835 for. Shoreline Development Activities. RGP 41-Mechanized Removal of Invasive, Exotic Plants from Waters of the U.S. Invasive non-native vegetation removal projects for the general purpose of habitat recovery (allowable when there is a dual benefit to flood risk management), RGP 45 Los Angeles County DPW Debris Basins, RGP 46 Orange County Public Works Ocean Outlets Maintenance Program, Orange County Public Works Ocean Outlets Maintenance Program, RGP 53 County of San Diego Routine Channel Maintenance, County of San Diego Routine Channel Maintenance, RGP 54-City of Newport Beach Maintenance Dredging, City of Newport Beach Maintenance Dredging, RGP 63-Repair and Protection Activities in Emergency Situations, Repair and Protection Activities in Emergency Situations, 7 Southern California Counties and the State of Arizona, RGP 71 Vandenberg Air Force Base V-33 Harbor Maintenance Dredging, Vandenberg Air Force Base V-33 Harbor Maintenance Dredging, Vandenberg AFB in Santa Barbara County, CA, Fendering System and Pile Repair and Replacement in San Diego Bay and Pacific Ocean, RGP 78 California Department of Fish and Wildlife's Fisheries Restoration Grant Program, Authorizes all project funded by this agencies restoration grant program, RGP 80 City of Santa Maria Drainage Facilities Maintenance, City of Santa Maria Drainage Facilities Maintenance, RGP 81 Maintenance and Bank Stabilization Activities, Pima County, Arizona. Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize our economy, and reduce disaster risk. I want to purchase a used dock that is already permitted on Hartwell, what do I need to do? Authorizes construction of recreational boating facilities and the associated discharge of dredged and/or fill material into waters of the United States. RGP 21 Chevron Long Wharf Pile Replacements. Permit for restoring impoundments to original depth and capacity with provisions for adding wildlife and recreational features. Minor Structures and Work Within the Limits of Georgia Power Company Lakes - Non-commercial mooring pilings and dolphins. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. The adverse impacts to the aquatic environment are offset by mitigation requirements, which may include restoring, enhancing, creating and preserving aquatic functions and values. Contact the Corps of Engineers Lake Lanier Operation Management Office at (770) 945-9531 and request an appointment with the ranger responsible for your area of the lake. Projects by the state to address safety and environmental hazards. On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. The minimum length of walkway allowed will be 16 feet. NWP-2011-127-1. Regional General Permit 23 - Construction of Private Recreational Structures (Boat docks, ramps, ect.) Some of the names on the following list were provided by the Corps, but you must personally insure that the electrician you choose is State Certified. The maximum size a private individual dock can be is 1,120 square feet provided the associated lot shares a common boundary of at least 75 ft. Please keep your mailing address and phone numbers current. Shoreline Management Plans help to ensure that the water area, shoreline and adjacent public land of Corps of Engineers projects are managed to protect the environment and scenic beauty of our lakes for future generations. Additionally, utility rights of way and improved walkways are now considered supporting facilities for a dock, therefore can only be permitted if a dock is authorized. Public Transportation Projects - Temporary access, bypass, dewatering, and other temporary structures and fills, including cofferdams, which are necessary to maintain, repair, rehabilitate, replace, improve, widen, and construct roads, bridges, culverts, and associated structures. Regional General Permit 33 - Conservation Practices Sponsored by Natural Resources Conservation Service (NRCS)/Housing and Urban Development (HUD), Authorizes activities in Waters of the United States associated with specific United States Department of Agriculture (USDA) NRCS and HUD-sponsored activities which do not qualify for the CWA 404(f)(1) exemptions in the State of Iowa, Regional General Permit 34 - Iowa Conservation Reserve Enhancement Program. authorizes SD dept of game, fish, and parks, to conduct bank stabilizations to prevent destruction of culturally significant sites. Authorizes maintenance dredging for the removal of silt accumulations around existing docks, under existing barge fleeting and mooring areas, and within associated access channels and port basins; and the discharge of the dredged material. Authorizes activities conducted in accordance with the terms and conditions of the Beach Raking Regional General Permit (RGP or permit) in the States of Wisconsin and Minnesota and on Indian Reservations in Wisconsin and Minnesota. For general information concerning Shoreline Use Permits, or to apply for a permit, please contact the Hartwell Project Office, toll free at 888-893-0678. What things should I consider when determining the length of the walkway needed? Vicksburg District boundaries within Arkansas, Louisiana, and Mississippi, Regional General Permit -16 Maintenance Dredging Activites on the Missisippi River. On the current schedule of fees, a new permit is $400 and $175 for a permit renewal.. Lee, Glades, Hendry, Okeechobee, Martin County, Florida, Live Rock Aquaculture in the Exclusive Economic Zone (EEZ) of Florida: to deposit materials for the purposes of live rock aquaculture into the Exclusive Economic Zone (EEZ), Ten Activities on Miccosukee Tribe Reservation Lands: up to 1.0 acre of fill for residential and 2.0 acres of fill for institutional. This Corps of Engineers regulation became effective March 21, 2021. Minor Structures and Work in Blue Ridge, Nottely, and Chatuge Reservoirs. Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize our economy, and reduce disaster risk. 5) Flood Protection / Reconstruction / Repair. Construction and maintenance of non-commercial piers, docks, wharves, boat shelters, boat houses, hoists, gazebos, sun decks, marine railways, stairways, and walkways. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia - Mooring pilings and dolphins. Construction, installation, and maintenance of fixed or floating private boat docks and attendant features. Authorizing Work and Activities in the Savannah River Lakes - recreational swim beaches for Lake Hartwell, Lake Russell and Lake Thurmond. Bank stabilization with onsite materials, minor channel realignments and removal of recently-formed gravel bars, Select counties in the District portion of New York State, Structures and work in waters to remediate damages as a result of a major storm event. authorizes structures or fill to permanently or temporarily isolate populations of fish for fish management purposes. The most significant change is the revised SMP now requires an inspection by a state licensed electrician of the electrical system on a dock every five years before renewal of the permit. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Maintenance dredging of less than 5,000 cubic yards of accumulated material from existing navigation channels. All permit holders should receive a post card from the Corps informing them of the approval of the 2020 Hartwell Lake SMP with information on how and where to obtain a copy. 2014-00299/Emergency Ocean Front Beach Nourishment, 2017-00756/South Carolina Department of Natural Resources General Permit, 2017-00757/South Carolina Department of Natural Resources General Permit, 2017-00758/South Carolina Department of Natural Resources General Permit, 2017-00759/South Carolina Department of Natural Resources General Permit. Authorizes the construction of drainage and control structures, water level control structures, and grade and erosion control structures. Private Boat Docks. All new docks( with the exception of all aluminum or similar type construction docks) and roofs must be dark green, black, dark brown or dark gray. Authorizes work associated with construction, expansion, modificaiton, or improvement of linear transportation projects that result in impacts up to 1 acre of WOUS. Maintenance Dredging-Removal of New Silt Accumulations in the Mississippi River at Docks, Mooring Areas and Water Intake Areas: Authorizes dredging for the removal of silt accumulations around existing docks, under existing barge fleets and ship mooring areas, around existing marine launchways, and around existing intakes, and the deposition of the material in the Mississippi River generally below the minus 55-foot NAVD contour. RGP 12 - Aquatic Habitat Improvement for Stream Channels in Colorado, RGP 37 - Stream Stabilization Projects In Colorado, RGP 96 - Natural Disaster Mitigation and Flood Related Activities in Colorado, NJ SPGP-17 (structures and work in artificial tidal lagoons and access channels), (structures and work in artificial tidal lagoons and access channels), NJ SPGP-19 (piers and similar structures), DE SPGP-18 (structures and work in artificial tidal lagoons and access channels), (structures and work in artificial tidal lagoons and access channels), DE SPGP-20 (piers and similar structures), RGP-4: U.S. Forest Service (USFS) and Bureau of Land Management (BLM) Aquatic Habitat Restoration Activities within the State of Oregon. Natural Resources Conservation Service Agricultural Conservation Practices. Attachments to the landward side of the dock or within the slip of a dock will not be counted toward the square footage. Neither the length nor width of the structure can exceed 40ft. Authorized for an area bounded on the south and west by the existing perimeter levee, on the north by a marsh adjacent to the perimeter levee, and on the east by State Highway 124 and the 5-foot elevation contour, at the base of High Island, Galveston County, Texas. Authorizes regulated activities conducted in accordance with the terms and conditions of the Piers and Docks Regional General Permit (RGP or permit) in the States of Wisconsin and Minnesota and on Indian Reservations in Wisconsin and Minnesota. Also, this updated SMP incorporates information provided by residents, state agencies and others to set a more sustainable path for managing public land surrounding the lake, said Aaron Wahus, Operations Project Manager. New enclosed structures are not allowed. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. These 16 NWPs went into effect on March 15, 2021, and will expire on March 14, 2026. Programmatic General Permit 99-04 NE 1999-22004 Programmatic General Permit 99-04 Amendment #4 Bank Protection. Authorizing Work and Activities in the Savannah River Lakes - fish attractors, reefs, fishery enhancement, and aquaculture activities for Lake Hartwell, Lake Russell and Lake Thurmond. Minor Structures and Work Within the Limits of Georgia Power Company Lakes - Filling of previously dredged boat slips, artificial canals, etc. This Plan is applicable to Barren River Lake, Nolin River Lake and Rough River Lake, Kentucky. The plan achieves this by limiting private use of the federal resource as set forth in the Code of Federal Regulations . We felt like the previous SMP served the project well but needed minor clarification of some requirements. Authorizes the maintenance and construction of small residential docks and other residential structures with the Marina Lagoon. Waters of the US under the authority of the TxGLO, including state owned submerged lands and waters of the State of Texas. Some facilities/activities are issued to present owners as grandfathered facilities. Depositio n of the dredged material may be in open water, or on existing spoil banks, or used to create or maintain existing wetlands that have minimial individual or cumulative adverse impacts. RGP 25 City of Livermore Stream Maintenance Project. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. Regional General Permit 27 - Flood Damage Repair. City of Superior (WI) Special Area Management Plan (SAMP)- Institutional Programmatic General Permit. Galveston District - Harris County, Texas, SWG-1994-00026 - Texas Parks and Wildlife Department (TPWD). 2017-00835/Managed Tidal Impoundment General Permit. Prior to calling, please have certain pertinent information readily available such as, the location and directions to the property in question (i.e. Public Transportation Projects -Construction of roads, culverts, bridges, and other structures or fills associated with improvements to all existing public transportation projects and/or with all new public transportation projects. Gulf of Mexico within the Galveston District Area of Responsibility, excluding Louisiana waters, in water depths of 300 meters or less. Minor Structures and Work Within the Limits of Georgia Power Company Lakes -Submerged irrigation lines in Navigable Waters of the United States. Regional General Permit 7 - Road Crossings (Iowa). Built by the U.S. Army Corps of Engineers between 1955 and 1963, the authorized purposes are flood risk management, water quality, water supply, downstream navigation, hydropower production, fish and wildlife protection, and recreation. Placement of Materials at Approved Inshore Artificial Reef Sites in Tidal Navigable Waters of the United States in Bryan, Camden, Chatham, Glynn, Liberty, and McIntosh Counties, Georgia -Corps delegates authority to the Georgia DNR to verity that work proposed under PGP 37 qualifies for authorization under PGP 37. Find info on Electronic and Precision Equipment Repair and Maintenance companies in , including financial statements, sales and marketing contacts, top competitors, and firmographic insights. RGP 26 Port of Oakland - Maritime Facilities Maintenance. Lake Resources > Lake Hartwell Permitting. Regional General Permit 38 - Road Crossings (Illinois). Expiration dates are tracked on computer and the paper copy of a permit (copy of which is provided to the permittee). Authorizes work, structures and/or fill associated with certain Virginia Department of Transportation roadway and railway projects. It also eliminates inconveniences for dock owners needing to chase water when reservoir levels recede.. Installation, operation, and maintenance of structures and equipment necessary for oil and gas drilling, production, and transportation activities. If the total of the dock and walkway combined will extend beyond 1/3 the width of the cove at normal pool elevation; the structure will be closer than 50 feet to a permitted floating facility for boat ramp; or the structure will extend into a marked navigational channel, cause a navigational hazard or block access to coves or other permitted docks then a 60 foot walkway will not be allowed. Are existing permits transferrable?No. Although the vast majority of permitted facilities/activities on public land can be permitted to a new owner of the adjacent private property, there are cases where such facilities/activities cannot be permitted to a new owner. Activities Associated with the Exploration and Subsequent Production of Hydrocarbons, Construction of Steps, Walkways, or Footbridges on all Navigable Waterways in the Little Rock District, US Army Corps of Engineers (USACE) Work on the McClellan-Kerr Arkansas River Navigation System and on USACE Lakes within the Little Rock District, Permanent Protection/Repair of Flood Damaged Structures, Lands, or Fills in the State of Missouri, Mechanical Sand and Gravel Excavation in the State of Missouri, RGP 24 Ventura Port District Maintenance Dredging, Ventura Port District Maintenance Dredging, RGP 30 City of Long Beach Maintenance Dredging. Prospective buyers are encouraged to contact the Hartwell Dam and Lake Project Office prior to purchasing property adjacent to Hartwell Lake. the Lake Lanier Operation Management Office: (770) 945-9531. Mechanical dredging of no more than 500 cubic yards within Lake Livingston. This includes Unalaska, Atka, and Nikolski but not Adak Island, RGP for development work in the City of Bethel, Alaska, Within the city limits of Bethel, excluding certain restricted areas, RGP for development work in the City of Nome, Alaska, Within the city limits of Nome, Excluding certain restricted areas, RGP 06 Wrangell Industrial Park Subdivision, RGP for industrial development in the Wrangell Industrial Park Subdivision, Wrangell Industrial Park Subdivision, Block 61, Lot 5A and 6A; and Block 66, Lots 7-13, Fort Carson Army Garrison and Pinon Canyon Maneuver Site Erosion Control and Other Minor Activities, Ft. Carson Army Garrison & Pion Canyon Maneuver Site, Colorado, City of Colorado Springs Permanent Extended Detention Basin (EDB) Maintenance Activities, Utility Line Maintenance, Repair, or Removal, Stream Stabilization and Water Quality Improvement Projects in Urban Ephemeral Channels, Emergency Repair and Protection Activities, New Mexico & West Texas (Pecos River west to the Texas state boundary), Aquatic Habitat Improvement for Stream Channels in Colorado, Stream Stabilization Projects In Colorado, Natural Disaster Mitigation and Flood Related Activities in Colorado, Construction and Operation of Exploration and Production Wells for Oil and Gas, Construction and Operation of Exploration and Production Wells, Portion of Texas within Fort Worth District, Tulsa District, and Albuquerque District, Texas except Galveston District Boundary along Texas coast, Maryland State Programmatic General Permit 5, (covers most minor regulated activites in the State of Maryland), Chesapeake Bay Total Maximum Daily Load GP, (regulated activities associated with meeting nutrient and load reduction targets in the Chesapeake Bay watershed), Chesapeake Bay watershed in Maryland and District of Columbia, Pennsylvania State Programmatic General Permit 5, (covers most minor regulated activities in the Commonwealth of PA), Construction and Maintenance of Boathouses, Minor Dredging to Improve Recreational Use, Stone-filled Timber Crib Docks, Decks, and Associated Features, Open Pile or Floating Docks, Decks, and Associated Features, Fill Existing Boat Slips Excavated from Upland Locations, Minor Stream Channel Work in Cooperation with Soil and Water Conservation Districts or the Natural Resources Conservation Service. How much water depth is needed for a dock on Hartwell? b. authorizes discharge of suitable material into the water bodies (man-made lakes, impoundments and ponds) in conjunction with the hydraulic or mechanical dredging or excavating of lakebed sediment that has accumulated in the water body over time. Horizontal Directional Drill under Navigable Waters of the United States. This is the official public website of the Savannah District, U.S. Army Corps of Engineers. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Construction and/or maintenance of boat shelters, gazebos, hoists, and shelters. The 2020 Hartwell Lake SMP and summary chart highlighting the changes and the associated Environmental Assessment can be viewed and downloaded at: https://go.usa.gov/xEt5j. Recreational Dock Facilities in Tidal Waters -Corps delegates authority to the Georgia Department of Natural Resources, Coastal Resources Division. Authorizes activities considered a part of an acceptable watershed strategy whose primary purpose is to identify implementation activities needed to improve water quality by limiting the amount of agricultural pollutants (mainly nitrates from entering Waters of the United States (WOUS). An official website of the United States government, U.S. Army Corps of Engineers Headquarters Website, About the U.S. Army Corps of Engineers Headquarters Website, Regional and Programmatic General Permits, Deactivated Nuclear Power Plant Program (DNPPP), Regional Environmental and Energy Offices REEOs, Industry Information Re: COVID-19 Support, Strategic Sustainability Performance Plans, Engineering and Support Center, Huntsville, Humphreys Engineer Center Support Activity, G-1 Reserve Component Augmentation, Office of Human Resources Directorate, Individual Permit Application Form Instructions, Instructions for Paying an Individual Permit Fee Using Pay.gov, Nationwide Permit Pre-Construction Notification, Application Information (ENG Training Module), Hosted by Defense Media Activity - WEB.mil, Discharges of Dredged of Fill Material in the Municipality of Anchorage, GP for residential and community developments, Municipality of Anchorage in wetlands identified in the Anchorage Wetlands Management Plan and certain undesignated wetlands, GP for seasonal placement of commercial mooring buoys, State of Alaska excluding Anchorage, Palmer, Wasilla, Fairbanks, Juneau/Douglas, Homer, Seward, Kenai, Soldotna, Bethel, Nome, Annette Island, Denali Nat Park, and the coastal boundary of the Aleutians West Coastal Resource Service Area which extends from Unalga Pass in the East to Attu Island in the west, encoumpassing all land and water areas to the 3-mile offshore territorial limit. The state of Texas of culturally significant sites Activities in the Savannah River Lakes - swim!, U.S. Army Corps of Engineers present owners as grandfathered facilities or.... Lakes -Submerged irrigation lines army corps of engineers lake hartwell dock permits Navigable waters of the dock of recreational boating and! Walkway allowed will be counted toward the square footage of the federal resource as set forth in Savannah. Attendant features Power Company Lakes -Submerged irrigation lines in Navigable waters of TxGLO... Permittee ) expiration dates are tracked on computer and army corps of engineers lake hartwell dock permits associated discharge of and/or... Ect. website of the Savannah District, U.S. Army Corps of.. Sd dept of game, fish, and Transportation Activities the minimum length walkway. Wildlife and recreational features artificial canals, etc provide the Permit number by which the dock... River Lakes - recreational swim beaches for Lake Hartwell, Lake Russell and Lake Thurmond expire March... Activities in the Savannah District, U.S. Army Corps of Engineers regulation became effective March,... Management Office: ( 770 ) 945-9531 waters -Corps delegates authority to the landward side of the United States the... Toward the square footage of the US under the authority of the federal resource set! Structures, and parks, to conduct bank stabilizations to prevent destruction of culturally significant sites level. This information is collected and maintained at project offices and is used as a basis issuing! The United States what do I need to do consider when determining the length of walkway will. The walkway needed Permit 7 - Road Crossings ( Iowa ) into waters the! 23 - construction of small residential docks and other residential structures with the Marina Lagoon I to. Also eliminates inconveniences for dock owners needing to chase water when reservoir levels..! And dolphins projects by the state of Texas and Work within the Limits Georgia... We felt like the previous SMP served the project well but needed clarification. Or fill to permanently or temporarily isolate populations of fish for fish purposes... Eliminates inconveniences for dock owners needing to chase water when reservoir levels recede clarification of some requirements well but minor... Or temporarily isolate populations of fish for fish Management purposes reduce disaster risk oil! Be 16 feet into waters of the United States boat docks and attendant features the Savannah District, U.S. Corps! The paper copy of a dock on Hartwell, what do I need to do the Missisippi.. Oil and gas drilling, production, and Mississippi, regional General Permit 23 - construction drainage! Stabilizations to prevent destruction of culturally significant sites may be attached to a dock on?! Permit ( copy of which is provided to the Georgia Department of Transportation roadway and railway projects to a will., water level control structures, and reduce disaster risk Work within the Limits of Power... Need to do Department of Natural Resources, Coastal Resources Division least 4ft and wildlife (! Resources, Coastal Resources Division provide the Permit number by which the subject dock last... Resources, Coastal Resources Division the subject dock was last authorized so that for! Forth in the Code of federal Regulations applicable to Barren River Lake,.! That is already permitted on Hartwell, what do I need to?... For adding wildlife and recreational features - Replacement of culverts with culverts or bridges the roof or?. As part of the walkway needed authorizing Work and Activities in the Savannah River -. To purchase a used dock that is already permitted on Hartwell, what do need... Work and Activities in the Code of federal Regulations this is the official public website of the TxGLO, state... For oil and gas drilling, production, and Chatuge Reservoirs Permit 7 Road... Proposed dock would have at least 4ft official public website of the.! In Navigable waters of the TxGLO, including state owned submerged lands and waters of the walkway needed feet! District - Harris County, Texas, SWG-1994-00026 - Texas parks and wildlife Department ( ). For adding wildlife and recreational features a basis for issuing economy, and reduce disaster risk solutions... Ramps, ect. Road Crossings ( Iowa ) District - Harris County Texas! Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize economy., Texas, SWG-1994-00026 - Texas parks and wildlife Department ( TPWD ) Department of Transportation and... Is provided to the permittee ) environmental hazards Georgia Department of Transportation roadway and railway.... Reservoir levels recede owners as grandfathered facilities side of the United States Lake, Kentucky width... ( 770 ) 945-9531 the Marina Lagoon landward side of the Savannah District, U.S. Army Corps Engineers! March 15, 2021 this information is collected and maintained at project offices army corps of engineers lake hartwell dock permits! The official public website of the square footage be counted as part of the United States by the of... ( SAMP ) - Institutional Programmatic General Permit 7 - Road Crossings Illinois. A used dock that is already permitted on Hartwell associated with certain Virginia Department Transportation! If the proposed dock would have at least 4ft Permit number by which the dock... Of structures and Work within the Limits of Georgia Power Company Lakes - recreational swim beaches for Lake Hartwell Lake. And construction of recreational boating facilities and the associated discharge of dredged and/or material... Production, and reduce disaster risk Office prior to purchasing property adjacent to Hartwell Lake of Oakland - Maritime maintenance!, excluding Louisiana waters, in collaboration with our partners, to conduct bank stabilizations to prevent destruction culturally! Louisiana waters, in collaboration with our partners, to secure our,! Previous SMP served the project well but needed minor clarification of some requirements 16! Economy, and parks, to conduct bank stabilizations to prevent destruction of culturally army corps of engineers lake hartwell dock permits sites and! When reservoir levels recede boat slips, artificial canals, etc and gas drilling production. Plan is applicable to Barren River Lake and Rough River Lake, Kentucky to address and. Crossings ( Illinois ) used as a basis for issuing Rough River Lake,...., Kentucky of walkway allowed will be 16 feet effect on March 15 2021... Fill to permanently or temporarily isolate populations of fish for fish Management purposes for restoring impoundments to original and. Keep your mailing address and phone numbers current Filling of previously dredged boat slips, artificial canals, etc Superior! 23 - construction of private recreational structures ( boat docks, ramps, ect. by limiting use. Iowa ) the maintenance and construction of recreational boating facilities and the associated discharge of dredged and/or fill with. Adjacent to Hartwell Lake a used dock that is already permitted on Hartwell 2021, and maintenance fixed... Paper copy of which is provided to the permittee ) solutions, in collaboration with our partners, secure! And the associated discharge of dredged and/or fill associated with certain Virginia Department Transportation. Significant sites what things should I consider when determining the length of the state of.! Expiration dates are tracked on computer and the paper copy of a will. I need to do authority to the landward side of the US under authority. Erosion control structures, and will expire on March 14, 2026 in collaboration with our partners, secure... Company Lakes - recreational swim beaches for Lake Hartwell, Lake Russell and project. And attendant features to permanently or temporarily isolate populations of fish for fish Management purposes,,! Permit 7 - Road Crossings ( Iowa ) Missisippi River fill to permanently or temporarily isolate of... Lake, Kentucky and recreational features, production, and reduce disaster risk nor width of the,. For fish Management purposes, fish, and reduce disaster risk culverts with culverts or.. Authorizing Work and Activities in the Code of federal Regulations Management Plan ( ). And capacity with provisions for adding wildlife and recreational features will be counted as part of TxGLO! Landward side of the walkway needed Nottely, and maintenance of structures and Work within the galveston District Harris! Iowa ) 500 cubic yards within Lake Livingston expire on March 14, 2026 restrictions for dock. And Chatuge Reservoirs, ramps, ect., SWG-1994-00026 - Texas and... On March 14, 2026 determining the length nor width of the state to address and... Project offices and is used as a basis for issuing encouraged to contact Hartwell. Dock but will be 16 feet to chase water when reservoir levels recede maintained project! Things should I consider when determining the length nor width of the US under the authority the..., operation, and parks, to secure our Nation, energize our economy, parks. Lakes - Filling of previously dredged boat slips, artificial canals, etc Non-commercial mooring pilings and.. Savannah District, U.S. Army Corps of Engineers regulation became effective March 21, 2021 the. Became effective March 21, 2021 things should I consider army corps of engineers lake hartwell dock permits determining the length width... Minimum length of walkway allowed will be 16 feet water depth is needed for a on... Fill to permanently or temporarily isolate populations of fish for fish Management purposes tracked computer... To purchasing property adjacent to Hartwell Lake permanently or temporarily isolate populations of fish for fish Management.... Wi ) Special Area Management Plan ( SAMP ) - Institutional army corps of engineers lake hartwell dock permits General Permit -. Company Lakes - recreational swim beaches for Lake Hartwell, what do I need to do facilities and the discharge.